Access 5.x |
Holiday calendar |
The system operator can define specific periods of operation or non-operation throughout the year. During these defined periods, the settings in the week schedule do not apply. The holiday schedule provides 24 periods.
A holiday period can be any number of consecutive days from 1…365. When the present date falls within a holiday period, the scheduler will use the settings for the weekday.
Setting Holiday periods |
||||||
Variable |
Available options & Selection |
Note |
||||
Holiday periods |
||||||
Time settings > Schedule > Holiday calendar |
||||||
Holiday calendar |
Off | On |
Indication if current date is within holiday period |
||||
Number of periods |
[0]-> [1]…[24] |
Number of holiday periods to configure |
||||
Start date |
End date |
Start and end dates of holiday periods |
||||
Holiday 1 |
[January 01] |
[January 01] |
||||
Holiday 2 |
[January 01] |
[January 01] |
||||
… |
… |
… |
||||
Holiday 24 |
[January 01] |
[January 01] |